岛国精品在线观看|抽插日韩一区二区三区|久久久久亚洲精品无码|亚洲一区二区在线观看免费|成人综合婷婷国产精品久久|久久精品成人免费观看97|国产特黄大片AAAAA毛片|无码人妻品一区二区三区精99

泊頭市卓遠(yuǎn)機(jī)械設(shè)備制造有限公司

快速聯(lián)系:卓遠(yuǎn)機(jī)械 卓遠(yuǎn)機(jī)械

產(chǎn)品目錄

聯(lián)系我們

公司名稱:泊頭市卓遠(yuǎn)機(jī)械設(shè)備制造有限公司
注冊(cè)地址:河北省泊頭市交河開發(fā)區(qū)
傳真號(hào)碼:0317-8031093
聯(lián)系方式:15369812793 (微信同號(hào))褚連勝
郵政編碼:062151
企業(yè)郵箱: 1358827475@qq.com
賬號(hào)開戶銀行:中國銀行泊頭支行
賬號(hào):100399943203
農(nóng)行賬號(hào):6228481739059615270

最新動(dòng)態(tài)

您的位置:卓遠(yuǎn)機(jī)械 >>新聞動(dòng)態(tài)

鑄鐵平臺(tái)的使用和安裝步驟介紹

時(shí)間:2016/1/5 15:38:22 瀏覽量:520

1.使用之前,先進(jìn)行安裝調(diào)試,以防損壞鑄鐵平臺(tái)的工作面;

2.使用過程中要注意防潮、防腐蝕,同時(shí)注意不要將鑄鐵平臺(tái)放于過高和過低的溫度環(huán)境下存放;使用環(huán)境:

使用地點(diǎn)

 

海拔高度

<1000M

最高溫度

+40℃

最低溫度

-5℃

最大日溫差

15K

相對(duì)溫度(在20℃時(shí))

95%

安裝地點(diǎn)

室內(nèi)

運(yùn)行方式

連續(xù)運(yùn)行

3.工件的重量不要超過鑄鐵平臺(tái)的額定載荷,以免造成工作質(zhì)量降低以及損壞鑄鐵平臺(tái)的結(jié)構(gòu)使之變形。
4.在鑄鐵平臺(tái)使用完畢后,應(yīng)將其清洗干凈,同時(shí)作好防銹工作。
一般鑄鐵平臺(tái)的使用壽命很長,只要采用正確的方法使用和存放,鑄鐵平臺(tái)工作面的精度可以保持使用2年以上,當(dāng)精度降低時(shí)可以通過調(diào)試或刮研工藝恢復(fù)。

鑄鐵平臺(tái)的安裝步驟介紹

1、墊鐵安裝:鑄鐵平臺(tái)調(diào)至水平、負(fù)荷均勻分布于各支點(diǎn)上。環(huán)境溫度(20±5)℃。使用時(shí)應(yīng)避免振動(dòng)。鑄鐵平臺(tái)采用墊鐵安裝的優(yōu)點(diǎn),安裝快捷、移動(dòng)方便。

2、支架安裝:鑄鐵平臺(tái)輕放到支架上、調(diào)整支架上的微調(diào)螺栓至到鑄鐵平臺(tái)水平。支架可減輕檢驗(yàn)人員的勞動(dòng)強(qiáng)度。支架高度一般在500-600mm左右。

3、地錨器安裝:鑄鐵平臺(tái)可以設(shè)計(jì)地錨器安裝,首先用戶根據(jù)鑄鐵平臺(tái)的圖紙做好地基和預(yù)埋孔,然后把地錨器放到提前設(shè)置的預(yù)留孔里,將鑄鐵平臺(tái)調(diào)整水平,

4、地腳螺栓安裝:鑄鐵平臺(tái)根據(jù)用戶的要求設(shè)計(jì)安裝方式,地腳螺栓安裝。


Introduction to the use and installation steps of cast iron platforms

1. Before use, first install and debug to prevent damage to the working surface of the cast iron platform;

2. Pay attention to moisture and corrosion during use, and be careful not to store the cast iron platform in too high or too low temperature environment; use environment:

使用地點(diǎn)Operation mode

 

海拔高度Altitude

<1000M

最高溫度Maximum temperature

+40℃

最低溫度lowest temperature

-5℃

最大日溫差Maximum daily temperature difference

15K

相對(duì)溫度(在20℃時(shí))Relative temperature (at 20 ° C)

95%

安裝地點(diǎn)Installation Location

室內(nèi)indoor

運(yùn)行方式place of use

連續(xù)運(yùn)行continue to operate

3. The weight of the workpiece should not exceed the rated load of the cast iron platform, so as to avoid the work quality degradation and damage to the structure of the cast iron platform.

4. After the cast iron platform is used, it should be cleaned and rust-proof work.

Generally, the service life of the cast iron platform is very long. As long as the correct method is used and stored, the precision of the working surface of the cast iron platform can be maintained for more than 2 years. When the accuracy is lowered, it can be recovered by debugging or scraping process.

Introduction to the installation steps of the cast iron platform

1. Bracket installation: The cast iron platform is lightly placed on the bracket, and the fine-tuning bolts on the bracket are adjusted to the level of the cast iron platform. The bracket can reduce the labor intensity of inspectors. The height of the stent is generally about 500-600 mm.

2. Ground Anchor Installation: Cast iron platform can be designed to install ground anchor. First, according to the drawings of cast iron platform, users can make foundation and pre-embedded holes, then put the ground anchor in the pre-set reserved holes, and adjust the level of cast iron platform.

3. Installation of cushion iron: Cast iron platform is adjusted to level and load is evenly distributed on each fulcrum. The ambient temperature is (20 +5)degrees Celsius. Vibration should be avoided in use. Cast iron platform has the advantages of cushion iron installation, fast installation and convenient movement.

4. Installation of anchor bolts: Cast iron platform is designed and installed according to user's requirements, and anchor bolts are installed.


Company name: botou zhuoyuan mechanical equipment manufacturing co.,LTD
Registered address: jiaohe development zone, botou city, hebei province
Fax number: 0317-8031093
Contact information: 15369812793 (WeChat with the same number)  liansheng chu
Postcode: 062151
Enterprise email:1358827475@qq.com
Account Opening Bank: Botou Branch of Bank of China
Account number: 100399943203
Agricultural bank account number: 6228481739059615270http://zhuoyuanjixie.com
  • 售前咨詢